Creation of Wetlands Banking Credits


Moonachie, NJ: Wetlands Construction and Restoration, Richard P. Kane Mitigation Bank

wetlands-creation-wetlands-banking-credits-kane-tract-nj

Geo-Con was contracted to perform two contracts in the existing Richard P. Kane Natural Area located in the Moonachie, New Jersey area of the Meadowlands District.

Both contracts were Wetlands Mitigation Banks, wetlands construction or restoration projects completed and sold as "credits" to offset impacts to existing wetlands. The credits from the Kane Bank are reserved for transportation-related impacts by four New Jersey State transportation agencies.

The first contract was for a small 20-acre parcel developed as, now locally rare, "freshwater" wetlands. Invasive phragmites were eradicated, and the parcel was disked and planted with native trees and plants that will thrive in the low-lying area.

The second, and significantly larger contract, focused on the restoration of over 240 acres of degraded, tidally restricted, invasive phragmites monoculture, to a biologically diverse fully functional tidal wetlands. To accomplish this Geo-Con performed:

  • Excavation of 115,000 Cubic Yards (CY) of tidal channel, which will tie into the adjacent, tidally influenced, Hackensack River.
  • Grading of 88,000 CY to create low marsh habitat
  • Creation of 7,114 Linear Feet (LF) of flood control berm. The berm is being constructed of soil-filled Concertainer® bastions manufactured by Hesco USA. The berm will protect adjacent properties from daily tidal flooding as well as major storm events. It is the first of this design-type to be performed in the Meadowlands.
  • Planting and seeding of native plant species
  • Protection of plants during establishment (goose fencing)

Because the site is composed of predominantly low-lying, hydric soils, excavation and grading cannot be completed by traditional earth-moving equipment. All equipment on site is ultra-low ground pressure, specifically designed for marsh work. Long reach excavators operating from timber mats are used exclusively for excavation and grading.

Geo-Con performed the following additional work in conjunction with the Tidal Contract:

  • Installation of a streambed plug to separate an existing freshwater stream from its confluence with a second stream that will have its tidal influence restored upon completion of the project.
  • Excavation of mercury impacted soils from the existing creek bed transecting the site.
  • Impacted soils were transported to an on-site stockpile area where they were stabilized with a solidifying reagent and transported off site for disposal.
  • Installation of bridges and trash racks over new channels. A Transco Pipeline and access road bisect the site; the bridges will allow Transco to maintain access to the pipeline through the site.



 

Corporate Headquarters: 1250 Fifth Avenue • New Kensington, PA 15068 • 724-335-7273